Formaks Energy

Your Solution Partner in Energy Management

Why Formaks Energy?



Academic Accumulation and Engineering Discipline

Formaks Energy draws its strength not only from on-site application experience but also from academic expertise at the master's and doctoral levels. With our science-based approach, we produce optimized and sustainable solutions with theoretical depth for complex energy problems.

whatsapp image 2026 03 30 at 22.00.59 (2)



Multidisciplinary Project Approach

We integrate electrical, mechatronic, and computer engineering with architectural disciplines under one roof. This holistic perspective allows us to design our projects not just as technical installations, but as integrated systems encompassing efficiency, aesthetics, and advanced technology software integration (Revit, etc.).

whatsapp image 2026 03 30 at 22.00.59




Rule of Law and Zero Error Vision

With our full command of current solar power and charging station regulations in Turkey, we manage all processes from the project design phase to turnkey installation with a "zero error" principle. We reflect our management experience in international energy projects into local solutions with world-class standards.

whatsapp image 2026 03 30 at 22.00.59 (3)

Our Services

Regulations and Requirements

NSEB ( Neredeyse Sıfır Enerjili Bina ) Yönetmeliği

Buildings classified as Nearly Zero Energy Buildings (NSEB) are required to have an Energy Performance Class of B or better in their Energy Performance Certificate, and must also meet at least 10% of their primary energy demand through on-site renewable energy use.

Buildings with a total construction area of 2,000 m² or more are required to be designed and constructed as NSEB. For these buildings, it is mandatory to submit the “Pre-Calculation Result Form” included in Annex-10, demonstrating compliance of architectural, mechanical, and lighting projects with this Regulation. This form must be prepared using the BEP-TR software and submitted together with the permit application project documents.

1734440621131

Parking Regulation

For building permit applications of new constructions with a mandatory parking requirement of 20 spaces or more, at least 5% of the required parking spaces—provided that it is not less than 1 space—must be arranged in accordance with relevant standards to be suitable for electric vehicles, including the installation of charging units.

If these regulations are not complied with, occupancy permit (habitation certificate), Energy Performance Certificate, and utility subscriptions cannot be obtained.

We're just a phone call away

We are always here to answer your questions and provide you with the most accurate solution. Contact us now.

Scroll to Top